#1 Manufacturing Blog - SYMESTIC
🏭 Free OEE Calculator - Overall Equipment Effectiveness Tool 2025
Written by
Symestic
| Jun 26, 2025 12:31:06 PM
🏭 Free OEE Calculator - Overall Equipment Effectiveness Tool 2025
Calculate your Overall Equipment Effectiveness with industry benchmarks & loss analysis
⏰ Step 1: Enter Production Time Data
💡 OEE Formula
OEE = Availability × Performance × Quality
World-class OEE: ≥85% | Good: 75-85% | Average: 60-75%
Total Shift Time (minutes)
Complete shift duration (e.g., 480 min = 8 hours)
Planned Downtime (minutes)
Breaks, changeovers, planned maintenance
Planned Production Time (minutes)
✓ Automatically calculated
Unplanned Downtime (minutes)
Machine failures, material shortages, quality issues
Operating Time (minutes)
✓ Automatically calculated
⚡ Step 2: Production & Quality Data
Ideal Cycle Time (seconds)
Fastest theoretical time per part
Total Parts Produced
Total number of parts manufactured
Defective Parts
Scrapped/rejected parts
Rework Parts
Parts requiring rework/repair
Good Parts
✓ Automatically calculated
Theoretical Maximum Parts
✓ Based on operating time
📊 Step 3: OEE Results & Analysis
Enter your production data to calculate your Overall Equipment Effectiveness
View full post