#1 Manufacturing Glossary - SYMESTIC

GAMP 5

Written by Symestic | Aug 28, 2025 9:11:01 AM

Definition

GAMP 5 (Good Automated Manufacturing Practice) is a guideline from the International Society for Pharmaceutical Engineering (ISPE) that defines a risk-based approach for compliant validation of computerized systems in GxP-regulated environments. This best practice establishes frameworks for software categorization, validation strategies, and lifecycle management of pharmaceutical IT systems to ensure data integrity and regulatory compliance.

Software Categorization per GAMP 5

Category 1 - Infrastructure Software: Operating systems, databases, and network software with established functionality. Minimal validation through supplier assessment and installation qualification.

Category 3 - Non-configured Products: Standard software (COTS - Commercial Off-The-Shelf) without configuration. Validation focuses on installation, operational, and performance qualification.

Category 4 - Configured Products: Standard software with GxP-relevant configuration. Extended testing of configured functionalities and business process integration.

Category 5 - Custom Applications: Bespoke software development for specific GxP applications. Full software development lifecycle with extensive documentation and testing.

Risk-Based Approach

Risk Assessment: Systematic evaluation of patient safety, product quality, and data integrity risks. Impact vs. probability matrix determines validation effort.

Critical Thinking: Scientifically justified decisions about validation scope based on business and regulatory risks. Justified approach instead of "one-size-fits-all".

Proportionate Effort: Validation activities correspond to identified risk. High-risk systems require extensive validation, low-risk systems minimal activities.

Validation Lifecycle (V-Model)

Planning Phase: User Requirements Specification (URS), Risk Assessment, and Validation Plan define project scope and strategy.

Specification Phase: Functional and Design Specifications detail system requirements and architecture. Requirements traceability ensures completeness.

Implementation Phase: Software development or configuration with code reviews and unit testing. Change control ensures documented modifications.

Testing Phase: Integration testing, system testing, and user acceptance testing validate compliance with requirements. Test protocols and reports document results.

Pharmaceutical Industry Benefits

  • Regulatory Compliance: Structured approach meets FDA 21 CFR Part 11, EU GMP Annex 11, and other GxP requirements
  • Cost Efficiency: Risk-based validation reduces unnecessary documentation and testing efforts
  • Quality Assurance: Systematic approach ensures data integrity and system reliability
  • Audit Readiness: Comprehensive documentation supports regulatory inspections and compliance evidence
  • Standardization: Consistent validation approaches across all computerized systems

Applications

Manufacturing Execution Systems (MES): Batch records, recipe management, and equipment control require Category 4/5 validation. Electronic batch records must be 21 CFR Part 11 compliant.

Laboratory Information Management Systems (LIMS): Sample tracking, test results, and certificate of analysis generation. Data integrity controls and audit trails are critical.

Quality Management Systems (QMS): Deviation management, CAPA, and document control systems. Workflow validation and electronic signature compliance.

Enterprise Resource Planning (ERP): SAP or Oracle systems for GxP-relevant processes like procurement and inventory management. Validation focuses on GxP modules.

Data Integrity (ALCOA+ Principles)

Attributable: All data must be assignable to uniquely identifiable persons. User access controls and digital signatures ensure attribution.

Legible: Data must remain readable throughout entire retention period. Archive and migration strategies preserve legibility.

Contemporaneous: Simultaneous data capture with business processes. Timestamp controls and real-time data capture.

Original: First recording or certified copy. Source data identification and copy controls.

Accurate: Error-free, complete, and reliable data. Data validation rules and error handling.

Documentation Framework

Validation Master Plan (VMP): Overarching strategy for all validation activities. Organizational standards and procedures.

System Specific Documents: URS, Functional Specifications, Design Specifications, and Validation Protocols for each system.

Operational Documents: SOPs, training records, and change control documentation for system operation.

Maintenance Documents: Periodic review, revalidation, and retirement planning.

Change Control and Configuration Management

Change Classification: Impact assessment determines change categories and required validation activities. Emergency changes follow accelerated procedures.

Version Control: Software versions and configuration items are systematically managed. Baseline management ensures traceability.

Testing Strategy: Change-specific testing based on impact assessment. Regression testing for system integration.

Supplier Assessment

Supplier Audit: On-site or remote audits evaluate supplier quality management systems. ISO 9001 or similar standards as baseline.

Quality Agreement: Contractual agreements on quality standards, change notifications, and support services.

Ongoing Monitoring: Periodic supplier reviews and performance monitoring. Corrective actions for quality issues.

Emerging Technologies

Cloud Computing: Special considerations for data residency, security, and supplier management. Shared responsibility models for validation.

Software as a Service (SaaS): Validation of cloud-hosted applications with limited system access. API testing and service level agreements.

Artificial Intelligence/Machine Learning: New approaches for AI/ML algorithm validation. Training data quality and model performance monitoring.

Integration with Other Standards

ISO 13485: Medical device quality management for combination products. GAMP 5 complements device-specific requirements.

ISO 27001: Information security management supports GAMP 5 security controls. Cybersecurity risk assessment.

ICH Q9 (Quality Risk Management): Risk management principles harmonize with GAMP 5 risk-based approach.

Future Trends

Agile Validation: Adaptation of GAMP 5 principles for agile development methodologies. Iterative validation and continuous compliance.

DevOps Integration: Automated testing and continuous integration in GxP environments. Infrastructure as code for validated systems.

Digital Maturity: Advanced analytics and process mining for validation efficiency. AI-supported documentation generation.

GAMP 5 continuously evolves to address new technologies and regulatory requirements while maintaining core principles of risk-based, scientifically justified approaches for computerized system validation.