Cloud MES for pharma and packagingShorter format changeovers. Less downtime. More packs from every line.
SYMESTIC shows you during the running shift on which blister, bottle or tube line time is lost, with duration and reason. Without touching the controllers of your machines.
The first machine is connected in under 3 hours.
With SYMESTIC. Start on one machine, expand line by line.
38 machines in GMP-regulated pharmaceutical packaging. In use at Klocke Gruppe across two plants, connected without touching the PLC.
MES for pharma and packaging, briefly explained
An MES (Manufacturing Execution System) for pharma and packaging captures what is actually produced in finishing and packaging: on blister machines, cartoners, labelers and in end-of-line packaging. It counts parts and cycles, measures format changeovers and captures downtime and scrap with a reason.
From this come KPIs such as OEE per line in real time, and quantities and times per production order are reported back to the ERP. SYMESTIC is such an MES as cloud software by subscription, operated on Microsoft Azure with data stored in the EU.
- What is recorded
- Part counts and cycles, format changeovers, downtime with reasons, rejected packs with reasons, process values such as temperatures, alarms, energy consumption
- KPIs
- OEE, availability, performance, quality, MTBF, MTTR, defect rate in percent or PPM
- Machine connectivity
- OPC UA via the Cloud Gateway, digital signals via the IoT Box, without touching the PLC
- ERP
- for example SAP, Microsoft Dynamics NAV, Microsoft Business Central and many more, also via the REST API
- Order reference
- Good quantity, scrap, times and downtime per production order
- GMP
- GMP-ready, in use in GMP-regulated pharmaceutical packaging at Klocke Gruppe, 38 machines in two plants
Where SYMESTIC measures on the packaging line
Blister machine
Cycles and part count, format changeovers against target time, temperatures as process values
Cartoner
Downtime with duration and reason, including short stops, for example a jammed folding carton
Inspection and labeling
Rejected packs with reason, also from connected camera systems
End-of-line packaging and ERP
Good quantity per production order, quantities and times reported back to the ERP
Pharmaceutical production in Germany in the 1st half of 2026 compared with the same period of the previous year
VCI, industry key figures for the 1st half of 2026, estimate based on Destatis, 07/16/2026
Revenue of the pharmaceutical industry in Germany in 2025, with 134,200 employees
VCI, industry portrait, July 2026
Pharmaceutical production is declining. Every line hour has to pay off.
In the first half of 2026, pharmaceutical production in Germany was 1.5 percent below the previous year. For the full year, the industry association vfa expects a decline of 2.2 percent.
In finishing and packaging, many products and formats run in small batches over the same lines. Every change to a qualified machine goes through change control. Yet the customer's delivery date stays fixed.
That is why the issues already on every plant's agenda matter:
- More packs from your existing lines
- Shorter format changeovers
- Delivery dates you can meet
- Evidence when a machine keeps failing and you talk to the manufacturer
All four goals depend on where time is lost at the line, how often and for how long.
Example calculation
With many format changeovers, every minute over target becomes a cost item.
A format changeover that takes a little longer is hardly noticed day to day. Over a year, it adds up. Enter the values of one of your lines.
Line hours per year on a single line
Calculation based on your assumptions. Not a measurement and not a commitment. With several packaging lines, the value adds up accordingly.
Why these losses appear in no report.
Every plant has KPIs. The problem is where they come from.
In the shift report
recorded manually
Measured at the line
automatically, with duration and reason
The figures are copied by hand.
Part counts and downtime are read off the control panel, transferred to paper forms, manual defect tracking cards or an Excel machine sheet, and later entered into the ERP by hand. What stopped on the line during the night shift, you find out at the morning meeting.
When one machine stops, the line stops.
Blister machine, cartoner and labeler run as a linked line. No shift report shows which machine triggered a stop and how often that happens.
There is no evidence to show the machine manufacturer.
When a machine keeps failing, the shift knows it. But in talks with the manufacturer, there is no single analysis showing frequency, duration and reason.
Nothing is changed on the qualified machine.
Touching the controller triggers change control and documentation, and some manufacturers do not allow any change to their PLC. That is why many lines remain without a data connection.
SYMESTIC measures what happens at every line.
SYMESTIC connects machines and workstations to the cloud and turns the data into KPIs, notifications and tasks for operators, shift leads and plant management. Every stop gets a duration and a reason, every rejected pack a reason.
Format changeover
Shorten format changeovers
You see how long each changeover takes and start where the most time is lost.
- With changeover detection switched on, SYMESTIC automatically creates a changeover stop at every product change and measures it against the target changeover time.
- Exceeding standard changeover time appears as a separate reason.
- The changeover matrix shows which changes between products take the longest.
- You start an order by barcode scan at the station, optionally straight into production or into changeover.
Stops
Reduce unplanned downtime
You eliminate the causes that cost the most line hours and back up failures with figures.
- SYMESTIC detects downtime automatically, via the machine's downtime signal or because nothing is being counted anymore.
- The operator selects the reason directly at the machine, in their own language. Analysis is by machine, order and shift.
- Short stops that nobody would otherwise note down are captured too. You decide the minimum duration.
- MTBF and MTTR show for each machine how often it fails and how long the repair takes. Alarms and fault messages go to the responsible people by push or email.
Cycle and OEE
Reach the planned quantity per shift
You see during the running shift as soon as a line slows down, and you take countermeasures before the planned quantity is missed.
- SYMESTIC counts the cycles at the machine and shows the last and the average cycle time against the target.
- The figures are shown live at the workstation and on the large display on the shop floor.
- OEE from availability, performance and quality is calculated automatically, per line, order and shift.
Orders and ERP
Quantities and times in the ERP without retyping
Cost estimates and delivery dates use actual production times.
- Orders come from your ERP to the line, with operations and time data.
- Measured good quantities, scrap, times and downtime are reported back, for example as a confirmation in SAP, without paper forms or retyping.
- Traceability per production order: for each order, you see what ran on which line.
- Connected systems include SAP, Microsoft Dynamics NAV, Microsoft Business Central and many more, also via the documented REST API.
Scrap and process values
Reduce scrap by reason
You see which defect reasons are most frequent and cost the most, on which line, with which product and in which shift.
- SYMESTIC captures scrap with a reason, manually at the workstation or as an NOK cycle from the machine signal, if the machine provides it.
- Analysis covers defect rates in percent or PPM and scrap costs in euros.
- Process values such as temperatures are recorded with timestamps. If a value exceeds its limit, SYMESTIC sends an alert.
- Camera systems for automatic quality inspection are often connected as well.
Shift team and management
One view for the shift team and management
Shift leads and production management use the same figures, and the morning meeting starts without searching for information.
- Quantities, downtime and format changeovers of all lines are shown in one view, the same for the shift and management.
- The digital shift log uses AI to summarize the shift for handover. The original entries remain unchanged.
- Shifts can be compared using the same KPIs.
Energy consumption per machine instead of a total at the main meter.
Sealing stations, heaters and drives on blister and packaging machines draw power, even during breaks and after the order ends. The main meter shows the total. Which machine uses how much and when, and whether it is producing at the time, remains unclear.
SYMESTIC shows the energy consumption per machine alongside part count and downtime and converts it to the unit produced. A separate analysis shows consumption while nothing is being produced. Consumption values come via OPC UA or Modbus.
Companies whose final energy consumption averaged more than 7.5 gigawatt hours per year over the last three completed calendar years must set up an energy or environmental management system under the German Energy Efficiency Act. SYMESTIC passes the consumption values per machine to your energy management system via the REST API. The system and its certification remain your responsibility.
- Per machine
- Energy consumption alongside part counts and downtime
- Per unit
- Consumption per unit produced
- Without active production
- Consumption during times when the machine is not producing
- Via the REST API
- Consumption values for your energy management
How your machines are connected.
A packaging line has machines from different manufacturers and years in sequence, some with a PLC that the manufacturer does not allow to be changed. Which route fits depends on what the controller provides. Before the start, we clarify with you whether a machine provides OPC UA; otherwise we use its digital signals.
Older machine or PLC without change approval
Digital signals are tapped without touching the controller.
Hardware
IoT Box as a DI Gateway
Records cycles, derives the part count, and captures downtime. NOK cycles if the machine provides the signal. Data goes to the cloud over your network or via cellular. At Klocke Gruppe, an IoT Box with cellular sits on every line.
Machine with OPC UA
For example, newer blister machines and cartoners, if the controller provides OPC UA.
Free software
Cloud Gateway
Runs on your server or computer and reads cycles, states, process values and alarms.
Machine with OPC UA, no computer of your own
If you do not want to provide a server or computer for the Cloud Gateway.
Hardware
IoT Box as a UA Gateway
Reads the controller via OPC UA. Data reaches the cloud through your network or a cellular connection.
SYMESTIC on Microsoft Azure
- Real-time KPIs
- Notifications and tasks
- Reporting back to your ERP
- Data stored in the EU
If your machines provide OPC UA, the Cloud Gateway runs as software on a server or computer at your site. For digital signals, or if you don't want to provide a computer, the IoT Box is added. You buy it once; prices are on the pricing page. Camera systems for automatic quality inspection are often connected as well.
Connect machines without touching the PLCGMP
GMP-ready, without touching the controller.
SYMESTIC runs at Klocke Gruppe in GMP-regulated pharmaceutical packaging. SYMESTIC changes nothing on the controllers of your machines for data capture.
Data capture without touching the PLC
The IoT Box taps digital signals. The Cloud Gateway reads controllers via OPC UA.
Data in the EU
Operation on Microsoft Azure, ISO 27001, with data stored in the EU. Every customer has its own database.
Secured sign-in
You secure sign-in with multi-factor authentication via Microsoft Entra. Data processing is governed by a standard agreement.
EU GMP Guidelines
Annex 15, No. 11.2: Change control
“Written procedures should be in place to describe the actions to be taken if a planned change is proposed to […] process, equipment, premises […] that may affect product quality or reproducibility.”
Annex 15 Qualification and Validation, abridged. Original text from the European Commission
What this means for your line
A planned change to a qualified machine goes through your change control. SYMESTIC reads signals at the line and changes nothing on the controller to do so. How you assess the connection in your quality system is up to you.
In the demo, you see on your use case which data SYMESTIC captures at your lines and where it is stored.
How pharmaceutical manufacturers work with SYMESTIC.
All case studiesGMP-regulated pharmaceutical packaging with SYMESTIC
Klocke Gruppe · Contract packaging and contract manufacturing of pharmaceuticals
From Excel to 38 connected machines in GMP-regulated packaging.
Klocke Gruppe packages and manufactures pharmaceuticals under contract, in Weingarten (Baden) and Appenweier. Before SYMESTIC, nothing was captured digitally; in Appenweier, analysis was done in Excel. It started with a test signal on the discharge conveyor of a blister line, and the first analysis was available the next day.
- An IoT Box with cellular on every line, connected without touching the PLC
- Orders come from Microsoft Dynamics NAV
- Operators record downtime reasons on a tablet, in Italian, Croatian, Serbian or Romanian, and call the mechanic when needed
- Connected in manufacturing: six tablet presses and two capsule filling machines
- The Weingarten plant recommended SYMESTIC to Appenweier
From another industry: four plants in six months.
Meleghy Automotive manufactures body components and introduced SYMESTIC in four plants, connected to SAP. The measured results were less downtime and more output.
Read the Meleghy case studyTest first, then roll out.
You don't have to switch the whole plant over at once. The entry point is a Proof of Value: 30 days, one machine, one use case, for example the blister machine with the most format changeovers. We define the success criteria in writing beforehand. Once the criterion is met, you continue by subscription, line by line.
Step 1
Select machine and criterion
One machine, one use case and written success criteria, for example the duration of format changeovers.
Step 2
Connect
Via the Cloud Gateway or the IoT Box, without touching the PLC. The first machine is connected in under 3 hours.
Step 3
Measure and decide
Real format changeover times, downtime and OEE, visible to operators and management. After 30 days, you decide based on figures.
Frequently asked questions from the pharmaceutical industry
What is an MES for pharma and packaging?
Is SYMESTIC GMP-ready?
Does SYMESTIC make changes to our machine controllers?
Does SYMESTIC replace our electronic batch record?
We already have an MES, a process control system or a production tracking module in the ERP. Why SYMESTIC?
Is file-based data exchange also possible?
Which machines can be connected?
Can we provide evidence of failures to the machine manufacturer?
Which signals do we need for good quantity and scrap?
Do we need hardware from SYMESTIC?
What does our IT need to provide and check?
Are our employees monitored?
How long does implementation take?
What does SYMESTIC cost?
Free live demo
In 30 minutes, you'll know whether SYMESTIC fits your lines.
You talk to an MES expert about your finishing and packaging. Using a use case like yours, you see how SYMESTIC captures format changeovers, downtime and quantities. Free of charge and no obligation.
Your demo is run by an MES expert from SYMESTIC.
What you take away from the call
- An initial assessment of what will measurably improve at your lines, i.e. format changeovers, downtime with reasons and quantity per shift
- How your machines would be connected without touching the PLC, via the Cloud Gateway or the IoT Box
- How counted quantities and times per production order get into your ERP without retyping
- Answers for IT and quality assurance: operation on Microsoft Azure, data stored in the EU, sign-in and data capture without touching the controller
- A realistic scope for the Proof of Value on one machine, with success criteria
Book a demo
30 minutes · Microsoft Teams · no obligation
No preparation needed. It only helps to know which lines you run and which ERP you use.
Continue to
- VCI Verband der Chemischen Industrie e. V.: Branchen-Kennzahlen zur Halbjahres-Pressekonferenz, 07/16/2026 (pharma: production −1.5%, estimate based on Destatis data).
- VCI: Branchenporträt 2026, July 2026 (pharma key figures: €61.9 billion revenue, 134,200 employees).
- vfa Die forschenden Pharma-Unternehmen: Herbstprognose 2026, press release 041/26 of 10/23/2026 (forecast for pharmaceutical production in 2026: −2.2%).
- European Commission, EudraLex Volume 4, EU GMP Guidelines, Annex 15: Qualification and Validation, in force since 10/01/2015, No. 11.2.
- German Energy Efficiency Act (EnEfG): Section 8(1).