Add the times for each operation or calculate average lead time from work in progress and throughput. Flow efficiency shows processing time as a share of total lead time.

Your inputs

The methods use different inputs for the same defined process.
parts
Time average within the defined process, rather than one snapshot.
parts/h
Completed parts per hour within the same process and on the same time basis.

Minutes for the same order or batch. Enter total processing time for the entire batch being tracked. Separate queue time before an operation from storage time between operations.

Lead time

–

Lead time

–

Flow efficiency

–

Processing time

–

Other time

–

Breakdown

Processing
Setup
Queue
Storage
Transport

Review scenarios

The first scenario applies to time addition, the second to Little’s Law. Lower WIP shortens lead time only if throughput stays unchanged.

20% less queue and storage time: new lead time
20% less WIP at unchanged throughput: new lead time

Recommendations

Review the largest time component first. Assign every period once. Compare orders and batches only with matching process boundaries and time bases.

OEE Calculator

Lead Time Calculator: Guide

1

Define the process

Set start and end points. Use times for the same order or batch at each operation.

2

Enter times or averages

Add setup and processing to queue, storage and transport time. Little’s Law instead uses average WIP and average throughput.

3

Review time shares

Flow efficiency here is processing time divided by lead time. Setup is excluded from processing. Little’s Law alone cannot determine flow efficiency.

The formulas at a glance

Time addition

Lead time = Σ(P + S + Q + W + T)

All times in minutes, across all operations.

Flow efficiency

Σ processing ÷ lead time × 100

Only processing time is included in the numerator.

Little’s Law

Lead time = average WIP ÷ average throughput

Stable process, matching system boundaries and time basis; parts/h gives hours.

Worked example: two operations

Operation 1 takes 30 minutes of processing, 10 of setup, 60 in queue and 5 in transport. Operation 2 takes 20 minutes of processing, 5 of setup, 30 in queue and 10 in storage.

ItemCalculationResult
Operation 130 + 10 + 60 + 0 + 5105 min
Operation 220 + 5 + 30 + 10 + 065 min
Lead time105 + 65170 min
Flow efficiency50 ÷ 170 × 10029.41%
Little’s Law500 parts ÷ 100 parts/h5 h

Limits of the calculation

  • Time addition models a serial process. Overlapping operations, transfer batches and parallel machines require a process schedule.
  • Avoid counting downtime again if the same minutes are already included in queue time. Cycle time per part is distinct from order lead time.
  • Little’s Law gives an average. It does not predict the delivery date of one order.

Frequently asked questions

How do you calculate manufacturing lead time?

For a serial process, add processing, setup, queue, storage and transport time across all operations.

What is flow efficiency?

Here it is processing time divided by lead time. Setup is excluded from the numerator. Align definitions before comparing figures.

When does Little’s Law apply?

For a stable, defined process with matching averages: average WIP = average throughput × average lead time.

Is lead time the same as cycle time?

Lead time covers passage through the process. Cycle time describes one recurring production cycle.

Which time basis should I use?

Use operating hours or calendar hours consistently. Throughput per operating hour and WIP measured across calendar days need reconciliation.