Net production time and required quantity in the same period – the basis of the takt time.
Determine available time
Available working time
Net production time per period (excluding breaks / planned downtime)
min
Shift length
min
Gross length of one shift
Breaks / planned downtime
Subtracted from the shift length
min
Shifts per period
×
Number of shifts in the period considered
Available time (calculated)
450min
Customer demand
pcs
Required quantity in the same period
Actual cycle time for the capacity check and work content for the station requirement.
Actual cycle time
s
Optional – actual time per unit, unlocks the capacity check
Total work content
s
Optional – sum of all tasks per unit, determines the station requirement
TAKT TIME
–
s/pc
Assessment
Takt time in minutes
–min
Utilization (cycle / takt)
–
Takt time
–
Actual cycle time
–
Output
–
Station requirement
–
i
Cycle time ≤ takt time ⇒ demand achievable
Actual cycle time
–s
Buffer per unit
–s
Max. output
–pcs
The bar shows the actual cycle time, the dashed line the takt time target.
Work content: –
Minimum number of stations so that no step exceeds the takt time.
–
Stations
Share & export your result
Your inputs are saved in the link – no account, no backend.
A free tool from SYMESTIC – Manufacturing Execution System from the cloud.
GUIDE IN 5 STEPS
How to calculate your takt time
Takt time is the available production time divided by customer demand. With the optional fields you can also check capacity and the station requirement.
1
Set the available time
Enter the net production time per period – directly or derived from shift length minus breaks and planned downtime.
2
Enter customer demand
The quantity required in the same period. From time ÷ demand the calculator instantly derives the takt time.
3
Check the cycle time (optional)
Enter your actual cycle time. The calculator shows whether it keeps pace with the takt, how high utilization is, and what output is achievable.
4
Add work content (optional)
The sum of all tasks per unit determines the minimum number of stations the line needs (line balancing).
5
Use the result
Read off takt time, feasibility, output and the station requirement – share the result via link or export it as a PDF.
FAQ – TAKT TIME
Frequently asked questions about takt time
The key terms, formulas and practical questions around takt time, cycle time and line balancing.
A free tool from SYMESTIC – Manufacturing Execution System from the cloud.