Inputs
Production · single run
Multi-stage process (RTY)
Rolled throughput yield across multiple steps.
#
Input
Defects
Yield
Six Sigma (DPMO)
DPMO & sigma level from defect opportunities.
Invalid input
Scrap + rework (50) exceed the quantity started (0). Please correct the values.
Ready to calculate
Enter a quantity started on the left to see first pass yield, scrap rate and final yield.
FPY
Scrap rate
0 ppm
Final yield
incl. recovered rework
Good parts · 1st run
of 0 pcs
Rework rate
0 pcs
FPY vs. final yield: First pass yield counts rework as a defect (first run), while final yield treats reworked parts as good. So FPY ≤ final yield always holds.
Breakdown of the starting quantity
0 pcs total
Good parts 0 · 0 %
Rework 0 · 0 %
Scrap 0 · 0 %
FPY benchmark
80 %
90 %
95 %
100 %
Guidance: ≥ 99 % excellent · 95–99 % good · 90–95 % average · < 90 % needs improvement.
Scrap cost
—
0 scrap parts× — per part
Multi-stage process
Rolled Throughput Yield
—
DPMO
—
Defects per Million Opportunities
Sigma level
— σ
Approximation incl. 1.5σ shift
Enter the defect opportunities per unit on the left to calculate DPMO and sigma level.
Formulas: FPY = (Started − Scrap − Rework) / Started · RTY = product of step yields. Values are for guidance only. A good companion: the OEE calculator (quality loss Q) and the reason-code logger.
Guide
How to calculate your first pass yield
Five steps from production quantity to first pass yield. All fields can be combined freely — results update live.
1Capture the starting quantityEnter the total number of parts fed into or started in the process — the basis for every rate.
2Enter scrapParts that are defective beyond repair, can no longer be recovered and are discarded.
3Enter reworkParts that were defective on the first run but were recovered through rework.
4Refine optionallyAdd unit cost for scrap cost, “Multi-stage process” for RTY and “Six Sigma” for DPMO & sigma level.
5Read the resultThe FPY ring, scrap rate, final yield and benchmark update automatically — including concrete recommendations.
Formula: FPY = (Starting quantity − Scrap − Rework) / Starting quantity. Example: (1,000 − 30 − 20) / 1,000 = 95 %. Rework deliberately counts as a defect of the first run.
FAQ
Frequently asked questions about first pass yield
Explained briefly: definition, calculation, benchmarks and the difference from RTY, final yield and Six Sigma.
Share & export the result
Copy the link, save as PDF or request a live demo right away.
A free tool from SYMESTIC – Manufacturing Execution System from the cloud.