First Pass Yield (FPY) Calculator

Calculate manufacturing first pass yield from parts started, scrap and rework. Compare first-pass output with final yield, or enter input and defect counts for each step to calculate rolled throughput yield (RTY). Step yields are calculated from these counts.

Inputs

Production · single run
Multi-stage process (RTY) Rolled throughput yield across multiple steps.
# Input Defects Yield
Six Sigma (DPMO) DPMO & sigma level from defect opportunities.
!
Invalid input
Scrap + rework (50) exceed the quantity started (0). Please correct the values.
Ready to calculate
Enter a quantity started on the left to see first pass yield, scrap rate and final yield.
FPY
Scrap rate 0 ppm
Final yield incl. recovered rework
Good parts · 1st run of 0 pcs
Rework rate 0 pcs
FPY vs. final yield: First pass yield counts rework as a defect (first run), while final yield treats reworked parts as good. So FPY ≤ final yield always holds.
Breakdown of the starting quantity 0 pcs total
Good parts 0 · 0 %
Rework 0 · 0 %
Scrap 0 · 0 %
FPY benchmark
80 % 90 % 95 % 100 %
Guidance: ≥ 99 % excellent · 95–99 % good · 90–95 % average · < 90 % needs improvement.
Cost impact
Scrap cost —
0 scrap parts
× — per part
Note: Rework cost (0 parts) is tracked separately and does not equal the full unit cost — it is deliberately not included here.
Multi-stage process Rolled Throughput Yield
—
RTY = the product of all step yields and is therefore always lower than the weakest individual step.
Six Sigma
DPMO — Defects per Million Opportunities
Sigma level — σ Approximation incl. 1.5σ shift
Reference: 6σ ≈ 3.4 DPMO. The sigma value is a common approximation and should be read as guidance, not an exact figure.
Enter the defect opportunities per unit on the left to calculate DPMO and sigma level.
Recommendations
Formulas: FPY = (Started − Scrap − Rework) / Started · RTY = product of step yields. Values are for guidance only. A good companion: the OEE calculator (quality loss Q) and the reason-code logger.

First pass yield formula and counting rules

FPY counts parts that pass the process the first time. Parts needing rework do not pass first time, even if they are later accepted. ASQ also excludes reruns and retests from first-pass output.

Assign each part to one first-pass outcome: good first time, scrapped, or requiring rework. In this calculator, include other first-pass failures in the rework category. Scrap and rework entries must be mutually exclusive. If a reworked part is later scrapped, preserve its original first-pass classification in this report.

MeasureFormulaUnit or basis
FPY(Parts started − scrap − rework) ÷ parts started × 100%
Final yield in this model(Parts started − scrap) ÷ parts started × 100Assumes all rework succeeds
RTYStep 1 first-pass yield × step 2 first-pass yield × …Use decimal step yields

Worked example: 1,000 parts through one process

Illustrative first-pass outcomes: 1,000 parts started, 30 scrapped on first pass and 20 sent to rework. The remaining 950 parts passed first time.

MeasureCalculationResult
First-pass good parts1,000 − 30 − 20950 parts
FPY950 ÷ 1,000 × 10095%
Scrap rate30 ÷ 1,000 × 1003%
Rework rate20 ÷ 1,000 × 1002%
Model final yield970 ÷ 1,000 × 10097%
Two-step RTY example0.95 × 0.98 × 10093.1%

FPY, final yield and RTY use different counts

  • Model final yield assumes every part sent to rework is recovered. If some repairs fail, calculate actual final yield from accepted final parts divided by parts started. Keep final scrap separate from the mutually exclusive first-pass outcomes.
  • RTY multiplies first-pass yields for successive steps. Use the same product route and compatible observation periods. Parallel routes and selective retesting need separate analysis.
  • Manufacturing yield is distinct from financial, crop or chemical yield. The descriptive bands in the existing calculator are orientation labels rather than a validated target for every manufacturing process.

Calculation source: ASQ: Quality Glossary, First pass yield. All worked-example inputs are illustrative.

Guide

How to calculate your first pass yield

Five steps from production quantity to first pass yield. All fields can be combined freely — results update live.

1Capture the starting quantityEnter the total number of parts fed into or started in the process — the basis for every rate.
2Enter scrapParts that are defective beyond repair, can no longer be recovered and are discarded.
3Enter reworkParts that were defective on the first run but were recovered through rework.
4Refine optionallyAdd unit cost for scrap cost, “Multi-stage process” for RTY and “Six Sigma” for DPMO & sigma level.
5Read the resultThe FPY ring, scrap rate, final yield and benchmark update automatically — including concrete recommendations.
Formula: FPY = (Starting quantity − Scrap − Rework) / Starting quantity. Example: (1,000 − 30 − 20) / 1,000 = 95 %. Rework deliberately counts as a defect of the first run.
WORKED EXAMPLE

How to read FPY and RTY results

The worked example above gives an FPY of 95% and a two-step RTY of 93.1%. Here is how the calculator rates such results, and which mistakes make yield look better than it is.

What the calculator flags

The calculator labels FPY with orientation bands and adds recommendations once certain rates are exceeded. These thresholds are built into the tool. Use them as a starting point for your own targets. Your own trend over time says more than a single band.

ResultCalculator signalWhat to check
FPY 99% or higherExcellentHold the level with SPC and audits
FPY 95% to under 99%GoodThe trend over time
FPY 90% to under 95%AverageThe most frequent defect types
FPY under 90%Needs improvementRoot causes and process capability (Cpk)
Scrap rate above 2%Recommendation to cut scrapThe most frequent defect patterns
Rework rate above 2%Recommendation to prevent reworkDefects at their source
A step yield below 97% in RTYWeakest step namedStart improvement at that step

Common mistakes

  • Averaging step yields. The two steps in the example average 96.5%, while RTY is 93.1%. Only the product shows how many parts pass every step the first time.
  • Counting a passed retest as first-pass good. A part that fails, gets reworked and passes on the second try is a rework case in FPY.
  • Comparing lines with different defect definitions. If one line records cosmetic touch-ups as rework and another does not, their FPY values measure different things.
FAQ

Frequently asked questions about first pass yield

Explained briefly: definition, calculation, benchmarks and the difference from RTY, final yield and Six Sigma.

First pass yield is the share of parts that pass through a process correctly on the first run — without rework and without scrap. It measures how reliably a process produces it “right the first time.”

FPY = (Starting quantity − Scrap − Rework) / Starting quantity. Example: with 1,000 parts started, 30 scrap and 20 rework, FPY = (1,000 − 30 − 20) / 1,000 = 95 %.

FPY counts reworked parts as defects because they were not okay on the first run. Final yield, by contrast, treats successfully reworked parts as good parts. That is why FPY is always less than or equal to final yield.

That depends heavily on the industry and process. As a rough guide, ≥ 99 % is excellent, 95–99 % good, 90–95 % average and below 90 % needs improvement. What matters most is the trend within your own process.

RTY is the yield across multiple consecutive process steps. It is the product of the individual yields of all steps (e.g. 0.98 × 0.97 × 0.95). Because the yields are multiplied, RTY is always lower than the weakest individual step.

DPMO stands for “Defects per Million Opportunities” and gives the defects per one million defect opportunities. From it the sigma level can be derived approximately — a Six Sigma process (6σ) corresponds to roughly 3.4 DPMO. The sigma value shown includes the usual 1.5σ shift and is an approximation.

Because the part did not meet requirements on the first run. Even if it is recovered later, rework causes extra effort, cost and lead time. FPY makes exactly this “hidden factory” visible.

Typical levers are root-cause analyses of the most frequent defects, defect prevention at the source (poka-yoke), monitoring process capability (Cpk) and SPC monitoring. In multi-stage processes it pays to improve the weakest step first.

Get your results as a PDF

Your inputs, results and rating on one page, plus a print view and a link to your results. Free.

Enter your values and your report will be ready.

Get your free report

Your PDF downloads as soon as you submit the form. The print view and the results link are then available on this page.

A free tool from SYMESTIC – Manufacturing Execution System from the cloud.

The print view is available after the free unlock at: https://www.symestic.com/en-us/tools/first-pass-yield-calculator

Preview: Scrap Rate and PPM Template

Download · Excel

Scrap Rate and PPM Template

Use this template to calculate scrap rate, PPM and DPMO from your own inspection figures.

What is inside

  • Data entry per week or batch with quantity inspected, defective parts and defects per characteristic
  • Scrap rate, PPM, DPMO and scrap cost by formula
  • Characteristics ranked by number of defects, with share and Pareto chart
Download the template (Excel)