First pass yield formula and counting rules
FPY counts parts that pass the process the first time. Parts needing rework do not pass first time, even if they are later accepted. ASQ also excludes reruns and retests from first-pass output.
Assign each part to one first-pass outcome: good first time, scrapped, or requiring rework. In this calculator, include other first-pass failures in the rework category. Scrap and rework entries must be mutually exclusive. If a reworked part is later scrapped, preserve its original first-pass classification in this report.
| Measure | Formula | Unit or basis |
|---|---|---|
| FPY | (Parts started − scrap − rework) ÷ parts started × 100 | % |
| Final yield in this model | (Parts started − scrap) ÷ parts started × 100 | Assumes all rework succeeds |
| RTY | Step 1 first-pass yield × step 2 first-pass yield × … | Use decimal step yields |
Worked example: 1,000 parts through one process
Illustrative first-pass outcomes: 1,000 parts started, 30 scrapped on first pass and 20 sent to rework. The remaining 950 parts passed first time.
| Measure | Calculation | Result |
|---|---|---|
| First-pass good parts | 1,000 − 30 − 20 | 950 parts |
| FPY | 950 ÷ 1,000 × 100 | 95% |
| Scrap rate | 30 ÷ 1,000 × 100 | 3% |
| Rework rate | 20 ÷ 1,000 × 100 | 2% |
| Model final yield | 970 ÷ 1,000 × 100 | 97% |
| Two-step RTY example | 0.95 × 0.98 × 100 | 93.1% |
FPY, final yield and RTY use different counts
- Model final yield assumes every part sent to rework is recovered. If some repairs fail, calculate actual final yield from accepted final parts divided by parts started. Keep final scrap separate from the mutually exclusive first-pass outcomes.
- RTY multiplies first-pass yields for successive steps. Use the same product route and compatible observation periods. Parallel routes and selective retesting need separate analysis.
- Manufacturing yield is distinct from financial, crop or chemical yield. The descriptive bands in the existing calculator are orientation labels rather than a validated target for every manufacturing process.
Calculation source: ASQ: Quality Glossary, First pass yield. All worked-example inputs are illustrative.
How to calculate your first pass yield
Five steps from production quantity to first pass yield. All fields can be combined freely — results update live.
How to read FPY and RTY results
The worked example above gives an FPY of 95% and a two-step RTY of 93.1%. Here is how the calculator rates such results, and which mistakes make yield look better than it is.
What the calculator flags
The calculator labels FPY with orientation bands and adds recommendations once certain rates are exceeded. These thresholds are built into the tool. Use them as a starting point for your own targets. Your own trend over time says more than a single band.
| Result | Calculator signal | What to check |
|---|---|---|
| FPY 99% or higher | Excellent | Hold the level with SPC and audits |
| FPY 95% to under 99% | Good | The trend over time |
| FPY 90% to under 95% | Average | The most frequent defect types |
| FPY under 90% | Needs improvement | Root causes and process capability (Cpk) |
| Scrap rate above 2% | Recommendation to cut scrap | The most frequent defect patterns |
| Rework rate above 2% | Recommendation to prevent rework | Defects at their source |
| A step yield below 97% in RTY | Weakest step named | Start improvement at that step |
Common mistakes
- Averaging step yields. The two steps in the example average 96.5%, while RTY is 93.1%. Only the product shows how many parts pass every step the first time.
- Counting a passed retest as first-pass good. A part that fails, gets reworked and passes on the second try is a rework case in FPY.
- Comparing lines with different defect definitions. If one line records cosmetic touch-ups as rework and another does not, their FPY values measure different things.
Frequently asked questions about first pass yield
Explained briefly: definition, calculation, benchmarks and the difference from RTY, final yield and Six Sigma.
First pass yield is the share of parts that pass through a process correctly on the first run — without rework and without scrap. It measures how reliably a process produces it “right the first time.”
FPY = (Starting quantity − Scrap − Rework) / Starting quantity. Example: with 1,000 parts started, 30 scrap and 20 rework, FPY = (1,000 − 30 − 20) / 1,000 = 95 %.
FPY counts reworked parts as defects because they were not okay on the first run. Final yield, by contrast, treats successfully reworked parts as good parts. That is why FPY is always less than or equal to final yield.
That depends heavily on the industry and process. As a rough guide, ≥ 99 % is excellent, 95–99 % good, 90–95 % average and below 90 % needs improvement. What matters most is the trend within your own process.
RTY is the yield across multiple consecutive process steps. It is the product of the individual yields of all steps (e.g. 0.98 × 0.97 × 0.95). Because the yields are multiplied, RTY is always lower than the weakest individual step.
DPMO stands for “Defects per Million Opportunities” and gives the defects per one million defect opportunities. From it the sigma level can be derived approximately — a Six Sigma process (6σ) corresponds to roughly 3.4 DPMO. The sigma value shown includes the usual 1.5σ shift and is an approximation.
Because the part did not meet requirements on the first run. Even if it is recovered later, rework causes extra effort, cost and lead time. FPY makes exactly this “hidden factory” visible.
Typical levers are root-cause analyses of the most frequent defects, defect prevention at the source (poka-yoke), monitoring process capability (Cpk) and SPC monitoring. In multi-stage processes it pays to improve the weakest step first.