Automotive
Four plants productive in six months
Pilot on a press line in Wilnsdorf, then rollout in Spain, the Czech Republic and Hungary. SAP R/3 and CASQ-it are connected.
- Downtime
- −10%
- Output
- +7%
- From pilot to live
- 6 months
