SELF-ASSESSMENT · EXCEL
Digital maturity self-assessment for manufacturing
Rate 24 statements about your production. The file shows your level in six areas and the area to start with.
Download the self-assessment

What is inside
The six areas are machine data, orders and control, quality, maintenance, KPIs and reporting, and connectivity and IT. A completed example shows how to read the result, and the last sheet names the next step.
- 24 statements in six areas, scored by formulas in the file
- A radar chart and a level per area, with the next step for each area
- A completed example and a sheet that explains how to use the file
If the gap is largest for machine data: SYMESTIC, the cloud-native MES, connects machines of any type and age via digital signals or OPC UA and records quantities, scrap and downtime. In a free 30-minute live demo, you see SYMESTIC applied to your own use case.
Who it is for
Who the self-assessment is for
The self-assessment is for plant managers, production managers and digitalization leads who want an honest view of where their production stands before they plan the next project. It works best when production, quality, maintenance and IT fill it in together, because each sees a different part of the plant.
How to work with the self-assessment
- 1
Rate the statements
Score each of the 24 statements from 0 to 3 for your plant as it runs today, not as it is planned.
- 2
Read the profile
Look at the radar chart and the level per area and note where the gap is largest.
- 3
Choose the next step
Take the next step named for your weakest area and set an owner and a date.
What a maturity assessment can show
Different views make the result honest
Production rates machine data differently than IT rates connectivity. Comparing the scores of several people shows where the plant disagrees with itself.
The weakest area sets the pace
A good KPI dashboard helps little when machine data is still typed in by hand. Starting with the lowest area raises the whole profile.
A repeat shows progress
Filled in again after six or twelve months, the same file shows which areas moved and whether the chosen step had an effect.
How to
How to assess the digital maturity of a plant
A digital maturity assessment rates how far a plant uses data and connected systems in its daily work. It scores a set of statements per area, for example machine data, quality or IT, on a fixed scale. The result is a level per area, which shows where the plant stands and which area to improve first.
Rate what runs today in daily operation across the plant or area you assess. A pilot on one line or a system that only one shift uses does not lift the score of the plant. Score each statement with evidence in mind: if you rate machine data as collected automatically, someone should be able to show where the data arrives and who uses it.
Maturity models usually describe four to six levels. A common sequence runs from paper and manual entry, through digital records in separate systems and connected data in one place, to analysis that explains causes and finally to decisions supported by forecasts. The levels build on each other, so analysis without connected data stays a manual project every time someone needs it.
Example
Example: profile of a plant across six areas
Four statements per area, each scored from 0 to 3, give up to 12 points per area. Sample scores from a joint session of production, quality, maintenance and IT:
| Area | Points | Share of maximum |
|---|---|---|
| Machine data | 3 | 25% |
| Orders and control | 7 | 58% |
| Quality | 6 | 50% |
| Maintenance | 5 | 42% |
| KPIs and reporting | 8 | 67% |
| Connectivity and IT | 9 | 75% |
Connectivity and IT score highest, machine data lowest. The plant has the network to collect data but does not use it yet, so the profile points to connecting the first machines rather than to more IT infrastructure.
Questions and answers
Common questions about digital maturity assessments
How do you perform a maturity assessment?
Choose a model with defined areas and a fixed scale, bring together people from production, quality, maintenance and IT, and score each statement for the current state with an example as evidence. Discuss the statements with the widest spread of scores, agree on one value, and derive one next step for the weakest area with an owner and a date.
What are the stages of the Industry 4.0 maturity index?
The acatech Industrie 4.0 Maturity Index describes six stages: computerization, connectivity, visibility, transparency, predictive capacity and adaptability. The first two stages form the basis of digitalization, the last four describe Industry 4.0. The index assesses four structural areas: resources, information systems, organizational structure and culture.
What are the five levels of the capability maturity model?
The Capability Maturity Model from software engineering uses five levels: initial, managed, defined, quantitatively managed and optimizing. Many manufacturing maturity models borrow its logic, from processes that depend on individuals, through documented standards, to processes that are measured and improved on a regular basis.
Is Industry 4.0 still relevant?
The term appears less often in marketing, but the content is the same: connected machines, data in one place and decisions based on that data. For a plant that still collects machine data by hand, the first stages are the relevant ones, whatever the label. A maturity assessment shows the next practical step either way.
Further reading
Download the self-assessment
Fill in the short form and you receive the download right after.