Skip to content

INDUSTRY GUIDE (PDF)

MES for pharma and packaging

Where packaging lines lose time, which KPIs matter and how to connect lines without changing the control of a qualified machine.

File preview: MES for pharma and packaging

Download the guide (PDF)

Industry Guide Pharma and Packaging: cover and inside page of the PDF

What is in the guide

The guide is written for plant managers, production managers, packaging managers and engineering. It uses the blister machine, cartoner, inspection and end-of-line packaging to show which signals you need and how a Proof of Value runs on one line. 8 pages, November 2026.

  • Six places where packaging lines lose time, and the KPIs for each
  • Signals per station and three ways to connect, without changing the control
  • Rollout in steps, the Klocke customer example, prices and a checklist to fill in

In a free 30-minute live demo, we show you SYMESTIC, the cloud-native MES, on a use case like yours.

See the SYMESTIC MES platform · Book a free demo

Who it is for

Who the pharma and packaging guide is for

The guide is for plant managers, production and packaging managers and engineering teams in pharmaceutical packaging. It helps when a linked line of blister machine, cartoner, inspection and end packaging runs, the reason for a stop only reaches paper after the shift, and every change to the control system goes through change control.

How to work with the pharma and packaging guide

  1. Walk the stations

    Assign the six loss points to your stations and note where the line stops most often today.

  2. Define the signals

    Decide for each station which signal delivers run, stop and count, and choose one of the three connection paths.

  3. Plan the rollout

    Go through the rollout in steps and fill in the checklist for your first line.

What matters with data from packaging lines

  • A linked line needs the reason per station

    When one station stops, the whole line stops. Assigning the stop to the station that caused it shows which machine holds the line back.

  • Changes to the control system take time

    On qualified equipment, every program change goes through change control. Tapping a signal without touching the control system keeps this effort small, and your quality assurance decides how it is assessed.

  • Evidence helps with the machine builder

    Downtime history, MTBF and MTTR per machine make faults verifiable. With these figures, warranty and service can be discussed on facts.

Download the pharma and packaging guide

Fill in the short form and you receive the download right after.

Download the guide