Shift handover template for Excel
Record open faults and tasks for the next shift in one handover log.
Download the template

What is in the template
Check the entries together at the handover. The file does not replace your plant’s release procedure.
- Handover per machine with fault, action and release status
- Tasks with owner, due time and status
- Count of open and overdue tasks
Who it is for
Who the shift handover template is for
The template is for shift supervisors, foremen and maintenance staff who want to hand over open faults, locked out machines and tasks cleanly to the next shift. It suits areas where the handover runs verbally or on loose notes today and information gets lost between two shifts.
How to work with the shift handover template
- 1
Prepare the handover
Enter the handover time and both roles and go through the open points for each machine.
- 2
Record the actions
Describe finding, next action and owner and mark locked out machines clearly.
- 3
Track the tasks
Maintain due dates and status and update the check time at every handover.
What makes a good shift handover
The handover happens at the machine
A look at the locked out press or the open first article clears up more than a line in a list. Go through the critical points together on site.
A fixed order prevents gaps
Covering safety, quality, material and open orders in the same order at every handover keeps any topic from being skipped under time pressure.
Both roles confirm the status
The outgoing and the incoming role sign off the discussed status. That makes clear from when the new shift is responsible.
How to
What a production shift handover should cover
A production shift handover passes on what the next shift needs to run safely and on plan: safety issues, machine status, quality problems, material situation, order status and open tasks. Each open point gets a status, the next action and an owner. Plan ten to fifteen minutes for it and record the result in writing.
Write every point so that someone who was not there can act on it. A note like "problems at press 4" makes the next shift start from scratch. A note like "press 4 stops about once an hour with a hydraulic pressure alarm, valve ordered, restart after acknowledging the alarm" tells them what to expect and what to do.
The written log and the conversation have different jobs. The log is the record that remains: what was open, who took it over and when. The conversation is for questions and priorities. Fill in the log before the conversation starts, so the few minutes together go to the two or three points that matter most for the coming shift.
Example
Example: handover from late shift to night shift
Sample entries for four machines at the 10 p.m. handover:
| Machine | Finding | Next action | Owner | Status |
|---|---|---|---|---|
| Press 4 | Hydraulic alarm about once an hour | Replace valve, part due at 11 p.m. | Maintenance | open |
| Molding machine 2 | Mold damaged | Do not restart, toolroom checks at 6 a.m. | Toolroom | locked out |
| Line 1 | First article for the next order not released | Quality approval before series start | Quality | open |
| Assembly 3 | Label printer replaced | Check the first 20 labels | Night shift supervisor | in progress |
The night shift sees at a glance which machine must stay off, which order waits for quality and what maintenance will do tonight. Every row names the person who acts next.
Questions and answers
Common questions about shift handovers
What makes a good shift handover?
It is short, written and specific. It covers the same topics in the same order every time, names an owner for every open point, and the incoming shift confirms what it has understood. A good handover also mentions what runs well, for example a new order that runs stable, so the next shift does not change a working setting.
What documentation is required at a shift handover?
At a minimum, the handover log with open faults, locked out machines, quality holds and open tasks, plus the initials of both supervisors. Regulated industries such as pharma or food may require more, for example batch records or cleaning status. Your quality system and customer requirements define what is mandatory for your plant.
What is a handover sheet?
A handover sheet is the form on which the outgoing shift records the status for the incoming shift. In production, it lists machines or lines with their status, open faults, quality issues and tasks. It turns a verbal handover into a record that can be checked later, for example during a complaint investigation.
Who should take part in the shift handover?
The outgoing and incoming shift supervisors at a minimum. Add the operators of critical machines and, where maintenance works in shifts, the outgoing technician. In large areas, a two step handover is common: operators hand over at their machine first, then the supervisors go through the log together.
How do you handle a task that stays open over several shifts?
Keep it in the log with its original start date and update the status at every handover. A task that moves from shift to shift without progress needs escalation, usually to the area manager or maintenance planning. The start date keeps it from looking new every day.