Calculate the machine hourly rate (€/h) from depreciation, cost of capital, floor-space, maintenance and energy costs – and see instantly how higher utilization lowers your rate.

Rate display
Classic cost accounting reports the pure machine rate. Labor costs can be added separately as an option.
Machine fixed costs
Purchase value, useful life and machine-related annual costs – the basis for the hourly rate.
Purchase / replacement value
€
Basis for depreciation and imputed interest
Useful life
years
!
For straight-line imputed depreciation
Imputed interest rate
%
Average-value method, default 6 % p.a.
Floor space
m²
Optional – for proportional floor-space costs
Floor-space cost per m² / year
€
Optional – proportional rent, energy, cleaning
Maintenance / servicing per year
€
Optional – spare parts, service, maintenance contract
Other fixed costs per year
€
Optional – tooling, insurance, software
Running hours & energy
Running hours per year plus, optionally, the machine's energy costs.
Capture running hours
Machine running hours per year
h
Operating time minus maintenance and downtime
Shift hours per day
h
Productive hours per working day
Production days per year
qty
!
Working days of the machine per year
Planned downtime per year
h
Maintenance, setup, planned breaks
Machine running hours per year 0h
Connected load
kW
Optional – unlocks the energy costs
Electricity price
€/kWh
Optional – energy price per kWh
Labor & currency (optional)
Operating labor for the rate incl. labor, plus the display currency.
Labor rate per hour
€
Optional – incl. employer labor overhead
Operators per machine
qty
Share of operating staff, e.g. 0.5
Currency
!
HOURLY RATE €/h
Largest cost driver

Fixed costs / year
Total costs / year
Fixed costs / year
Depreciation, interest, floor space, maintenance, other
Energy / year
Scales with the running hours
Total / year
Fixed costs plus energy
Running hours / year
h
Productive hours – basis of the rate
Cost breakdown per hour
What your machine hourly rate is made up of – per year and per running hour.
Imputed depreciation
Imputed interest
Floor-space costs
Maintenance
Other fixed costs
Energy costs
Imputed depreciation and interest are not balance-sheet figures. The pure rate excludes labor; labor costs are reported separately.
Utilization lever
What-if scenario

Fixed costs stay the same – no matter how many hours the machine runs. More productive running hours spread the same fixed costs and lower the rate per hour.

Increase utilization / running hours by +25 %
Current rate
€/h
At +25 %
€/h
Savings per hour
−€/h
Recommendations

Get your results as a PDF

Your inputs, results and rating on one page, plus a print view and a link to your results. Free.

Enter your values and your report will be ready.

Get your free report

Your PDF downloads as soon as you submit the form. The print view and the results link are then available on this page.

Please enter the purchase value, useful life and running hours per year to calculate the machine hourly rate.

A free tool by SYMESTIC – cloud-based Manufacturing Execution System.
HOW THE CALCULATOR WORKS

Quick guide: machine hourly rate in 3 steps

The calculator spreads all machine-related annual costs across your running hours. Here is how to proceed:

1

Capture fixed costs

Purchase value and useful life give the imputed depreciation; the interest rate gives the imputed interest. Add floor-space, maintenance and other fixed costs per year.

2

Running hours & energy

Enter the machine running hours per year – directly or derived from shift hours and production days. Connected load and electricity price add the energy costs.

3

Read the rate & use the lever

The machine hourly rate appears instantly, including the breakdown per hour. The utilization lever shows how the rate falls with more running hours.

The formulas at a glance
Imputed depreciation Value ÷ useful life Straight-line imputed depreciation of the purchase or replacement value.
Imputed interest (Value ÷ 2) × interest rate Average-value method – charges interest on the capital tied up on average.
Energy costs kW × running hours × price Variable costs that rise with the running hours.
Machine hourly rate Annual costs ÷ running hours Sum of all machine-related annual costs per productive running hour.
Utilization scenario (Fixed + energy′) ÷ hours′ The same fixed-cost block spread across more running hours – yielding a lower rate.
All cost types are determined per year and divided by the running hours per year. Sources: Lexware, Controllingportal, BWL-Lexikon (average-value method).
WORKED EXAMPLE

Machine hourly rate calculation: worked example with numbers

A contract machining shop needs the hourly rate for a CNC machining center bought for €350,000. The machine runs two shifts on 230 days a year. All figures are illustrative.

Inputs

Purchase value€350,000
Useful life8 years
Imputed interest rate6 %
Floor space40 m² at €110 per m² and year
Maintenance per year€9,000
Other fixed costs per year (tooling, insurance)€4,000
Running hours, from shifts15 h per day, 230 production days, 250 h planned downtime
Connected load and electricity price30 kW at €0.22/kWh
Labor rate and operators per machine€38/h, 0.5 operators
  1. Running hours per year15 h × 230 days − 250 h3,200 h
  2. Imputed depreciation€350,000 ÷ 8 years€43,750 per year
  3. Imputed interest (average-value method)(€350,000 ÷ 2) × 6 %€10,500 per year
  4. Floor-space costs40 m² × €110€4,400 per year
  5. Energy costs30 kW × 3,200 h × €0.22/kWh€21,120 per year
  6. Total annual costs€43,750 + €10,500 + €4,400 + €9,000 + €4,000 + €21,120€92,770 per year (fixed €71,650, energy €21,120)
  7. Machine hourly rate€92,770 ÷ 3,200 h28.99 €/h
  8. Rate including labor28.99 €/h + €38/h × 0.547.99 €/h

Result: The calculator shows a machine hourly rate of 28.99 €/h without labor and 47.99 €/h including labor.

Cost table: where the rate comes from

Imputed depreciation is the largest block at 47 % of the annual costs. Only the energy costs grow with the running hours. Everything else is fixed, so the hours decide the rate. The utilization lever in the calculator shows this: with 25 % more running hours (3,200 to 4,000 h) the rate falls to 24.51 €/h, which is 4.48 €/h less.

Cost typePer yearPer running hourShare
Imputed depreciation€43,75013.67 €47 %
Imputed interest€10,5003.28 €11 %
Floor-space costs€4,4001.38 €5 %
Maintenance€9,0002.81 €10 %
Other fixed costs€4,0001.25 €4 %
Energy costs€21,1206.60 €23 %
Total€92,77028.99 €100 %

Common mistakes

  • Dividing by shift hours or calendar hours. Planned downtime, setups and maintenance come off first. With 3,450 shift hours instead of 3,200 running hours, the rate comes out too low and every quote built on it loses money.
  • Charging interest on the full purchase value. The average-value method uses half of it: €10,500 here, not €21,000.
  • Using the tax depreciation period instead of the real useful life. Imputed depreciation follows how long the machine will actually run in your plant.
  • Counting the operator twice, once in the machine rate and again as a labor line in the quote. Keep the pure rate of 28.99 €/h and add labor in exactly one place.
FREQUENTLY ASKED QUESTIONS

Machine hourly rate – frequently asked questions

Terms, formulas and practical tips around machine hourly rate costing.

The machine hourly rate indicates how much it costs to operate a machine per running hour. It is derived from the machine-related costs per year divided by the machine running hours per year and serves as the basis for costing, quotations and investment decisions.

Machine hourly rate = machine-related costs per year ÷ running hours per year. The annual costs are made up of imputed depreciation, imputed interest, floor-space costs, maintenance, other fixed costs and the energy costs.

Straight-line imputed depreciation is derived from the purchase or replacement value ÷ useful life in years. It is imputed and therefore independent of the balance-sheet depreciation.

Using the average-value method: imputed interest = (purchase value ÷ 2) × interest rate. Over the useful life, about half of the capital is tied up on average, so interest is charged on half the value.

The fixed costs (depreciation, interest, floor space, maintenance) stay the same, regardless of the running hours. Spreading the same fixed costs across more productive hours lowers the rate per hour. Higher availability and less downtime lower the machine hourly rate directly – which is exactly what the utilization lever makes visible.

In classic cost accounting the pure machine hourly rate is reported without labor costs. Labor costs are added separately. This calculator therefore optionally shows a rate including labor via the toggle in the header area.

No. The machine hourly rate is highly specific to each operation and depends on the purchase value, running hours and cost structure. Instead of a blanket benchmark, the calculator shows the largest cost driver and the utilization lever.

At least three values: the purchase value, useful life and the machine running hours per year. Interest rate, floor-space, maintenance, other fixed and energy costs refine the result and are optional.

The print view is available after the free unlock at: https://www.symestic.com/en-us/tools/machine-hourly-rate-calculator

Preview: Machine Hourly Rate Calculation

Download · Excel

Machine Hourly Rate Calculation

Calculate the cost per machine hour from your annual costs and productive running time.

What is inside

  • Depreciation, imputed interest and floor space costs
  • Energy, maintenance and other machine costs
  • Cost shares per hour with the calculation shown
Download the hourly rate calculation (Excel)