SYMESTIC OEE CALCULATOR

OEE Calculator

Calculate Overall Equipment Effectiveness from availability, performance and quality. Enter production time, downtime, ideal cycle time and part counts, then review each loss and an optional value scenario.

Calculation mode
TEEP additionally accounts for the utilization of your calendar time.
1
Time data
Shift and downtime data – the basis for Availability.
Total shift time
min
e.g. 480 = 8 hours
Planned downtime
min
!
Breaks, shift changes, planned maintenance
=Planned production time 420min
Unplanned downtime
min
!
Breakdowns, changeovers, missing material
=Operating time 345min
Calendar time
min
!
1440 = 24 h (1 day) – same basis as the shift above
2
Production & Quality
Part counts and cycle time – the basis for Performance and Quality.
Ideal cycle time
!
Theoretically fastest time per unit
Total parts produced
pcs
Good parts + scrap + rework
Scrap
pcs
!
Rework
pcs
=Good parts 550pcs
=Theoretically possible parts 690pcs
3
Economics (optional)
Add the margin per unit to see your loss in €.
Contribution margin per unit
EUR
Margin / lost profit per good part
Currency
Shifts per day
Production days / year
OEE Target 85 %
Rating

TEEP
Utilization
! Performance above 100 % – please check the cycle time, part count or operating time. The ideal cycle time is probably set too optimistically.
Availability
Target 90 %
Performance
Target 95 %
Quality
Target 99.9 %
Where your time is lost
Breakdown of planned production time into effective production and losses.
Total loss
0 % of planned production time 100 %
Effective production (OEE)
Availability loss
Performance loss
Quality loss
Possible good parts at 100 %:
Lost good parts / shift
Potential per shift
Additional potential per year
Potential by cause (per shift)
Availability
Performance
Quality
€
Hidden Factory – your €-potential
Enter a contribution margin per unit on the left to calculate your hidden potential in euros.
Six Big Losses
The six big loss categories, mapped to the three OEE factors.
Availability
Equipment breakdowns
Setup & changeover losses
Performance
Idling & minor stops
Reduced speed
Quality
Quality defects / scrap
Startup & rework losses
A more precise breakdown by individual cause comes from a Reason-Code-Logger with live machine data. Reason-Code-Logger
Benchmark
Your value
World-class target
85 %
World-class factors: Availability 90 % · Performance 95 % · Quality 99.9 %
Recommendations
Share & export your result
Your inputs are stored in the link – no account, no backend.

Please fill in the required fields on the left to see your OEE result.

A free tool from SYMESTIC – Manufacturing Execution System from the cloud.

OEE formula: availability, performance and quality

OEE combines three factors measured over the same reporting period. Availability compares run time with planned production time. Performance compares actual output with output possible at the ideal cycle time. Quality counts first-time good parts.

In this calculator, scheduled time minus the entered planned exclusions gives planned production time. The unplanned downtime input then reduces run time. Include changeovers and setup time within planned production time as availability losses when production is scheduled. Record their minutes in that downtime field, even when the setup itself was planned.

MeasureFormulaUnit or basis
AvailabilityRun time ÷ planned production timeDecimal factor A
PerformanceProduced parts ÷ theoretical parts at ideal cycleDecimal factor P
Quality(Produced − scrap − rework) ÷ producedDecimal factor Q
OEEA × P × Q × 100%

Worked example: OEE for a 480-minute shift

Illustrative inputs: 480 minutes scheduled, 30 minutes excluded before planned production time, 45 minutes downtime and a 30-second ideal cycle. Of 720 produced parts, 20 are scrap and 10 require rework.

MeasureCalculationResult
Planned production time480 − 30450 min
Run time450 − 45405 min
Theoretical parts405 × 60 ÷ 30810 parts
Availability405 ÷ 45090%
Performance720 ÷ 81088.89%
Quality690 ÷ 72095.83%
OEE0.90 × (720 ÷ 810) × (690 ÷ 720)76.67%

Downtime cost scenarios and calculation limits

  • Theoretical part counts are rounded down in the existing calculator. Performance is capped at 100%. If actual output exceeds the theoretical count, review ideal cycle time and counting boundaries before interpreting the result.
  • The optional value scenario compares potential good output with actual good output and multiplies the gap by the contribution margin you enter. It includes availability, performance and quality losses. It is not a direct measurement of downtime cost or guaranteed recoverable revenue.
  • For the example, potential good output is 900 parts. The gap to 690 good parts is 210. At an illustrative €5 contribution per part, the model value gap is €1,050 per reporting period. Fixed costs and actual demand are outside that scenario.
  • Use the same first-pass outcome rules for scrap and rework so no part is deducted twice. OEE uses planned production time; TEEP additionally considers calendar utilization.

Calculation source: Lean Enterprise Institute: Overall Equipment Effectiveness. All worked-example inputs are illustrative.

GUIDE

How the OEE calculator works

OEE (Overall Equipment Effectiveness) measures how productively a machine actually runs. In four steps you get your value – including the breakdown into Availability, Performance and Quality as well as the resulting loss in euros.

1
Capture time data
Enter the total shift time as well as planned (breaks, maintenance) and unplanned downtime (breakdowns, changeovers).
2
Production & Quality
Enter the ideal cycle time, parts produced, scrap and rework – the basis for Performance and Quality.
3
Economics (optional)
Enter the contribution margin per unit to see the hidden loss in euros per shift and per year.
4
Read your result
Your OEE value, the three factors, the biggest lever and the benchmark against the world-class target of 85 %.
The OEE formula
OEE = Availability × Performance × Quality
Availability
Operating time ÷ planned production time
World-class target: 90 %
Performance
(ideal cycle time × parts produced) ÷ operating time
World-class target: 95 %
Quality
Good parts ÷ parts produced
World-class target: 99.9 %
FAQ

Frequently asked questions about OEE calculation

OEE (Overall Equipment Effectiveness) is the key metric for the productivity of a machine. It combines three factors – Availability, Performance and Quality – into a single percentage. 100 % OEE means: only good parts are produced, at maximum speed, with no downtime at all.

OEE = Availability × Performance × Quality. Specifically: Availability = operating time ÷ planned production time, Performance = (ideal cycle time × parts produced) ÷ operating time, and Quality = good parts ÷ parts produced. The three factors are expressed as percentages and multiplied together.

85 % is considered world-class. The average in discrete manufacturing is around 60 %. Values below 40–50 % are critical – but offer the largest and often quickly achievable improvement potential. The world-class target is made up of Availability ≥ 90 %, Performance ≥ 95 % and Quality ≥ 99.9 %.

OEE evaluates the planned production time. TEEP (Total Effective Equipment Performance) additionally factors in utilization and measures against the entire calendar time (24/7): TEEP = Utilization × OEE. TEEP therefore shows the maximum capacity potential of a machine – for example, whether an additional shift would pay off.

The six big loss categories are mapped to the three OEE factors: Availability – equipment breakdowns and setup/changeover losses; Performance – idling/minor stops and reduced speed; Quality – process defects/scrap and startup/rework losses.

Always start with the biggest loss. Availability: reduce setup times with SMED and establish preventive maintenance. Performance: eliminate minor stops and stabilize equipment speed. Quality: root-cause analysis, poka-yoke and a higher First Pass Yield reduce scrap and rework.

The hidden factory describes the capacity that goes unused because of OEE losses. At 60 % OEE, a second, invisible factory is effectively working against you. This capacity can often be recovered without additional investment, simply through a higher OEE – the calculator can quantify it in euros on request.

The required inputs are: total shift time, planned and unplanned downtime, ideal cycle time as well as parts produced, scrap and rework. Optional are the contribution margin per unit (for the euro valuation), the calendar time (for TEEP).