Since 1991 I have been connecting machines to higher-level systems.
Back then with Simatic S5, warehouse management and material flow control. Today with OPC UA, IoT gateways and Cloud MES. The technology has changed, but the underlying problem has stayed the same: how do you reliably get data out of a machine that was never designed for it?
I started as an automation engineer at an engineering office.
For four years I programmed and commissioned warehouse management, material flow control and plant control systems. On top of that I built plant-wide visualization systems with COROS. That was the time when I learned what it means to get software running under real production conditions – not in the lab.
At Hermos AG I looked after large-scale projects in Eastern Europe and China.
Conveyor systems, process engineering, paint lines. Programming, commissioning, on-site coordination. Anyone who commissions a paint line in a factory that is still under construction quickly learns that automation does not work from a desk.
I have been with SYMESTIC since 2000.
First I built up the automation engineering department and led it for eleven years. During that time we developed the software standard for process engineering plants in the beverage and wood industries, carried out retrofit projects from Simatic S5 to S7 and TIA, and laid the foundations for the machine connectivity that is now part of the SYMESTIC Cloud MES platform.
Since 2019 I have been an MES Consultant and Project Manager.
I accompany manufacturing companies from the initial enquiry through to go-live: analysing the machine park, defining the connectivity strategy, setting up data collection, configuring KPIs, training staff. Most customers have a mixed machine park: modern controllers next to equipment from 1990. That is exactly my strength – I know both worlds because I have worked in both.
What drives me:
Many companies believe their old machines cannot supply data. That is almost never true. With the right gateway and the right approach, any piece of equipment can be connected – without PLC intervention, without production interruption.
That moment when a customer sees real machine data on their dashboard for the first time and realizes what they didn’t know for years – that is the reason I do this job.
Career Path
Areas of Expertise
On the SYMESTIC Blog
51 articles in this language
Guides 1
-
Production Data Collection (PDC): 5 Data Types, Systems & Guide 2026
Manufacturing and production data collection explained: 5 data types, PDC vs. MDC vs. MES, requirements for modern systems and how to implement them.
Glossary 50
- 5 Whys: Where the Chain Actually Breaks
- Alarm Management in Manufacturing: PLC Alarms, MES and OEE
- Change Control in Manufacturing: The Engineer's View
- CMMS: Functions, CMMS vs. MES & Maintenance Strategies
- Corrective Maintenance: When It Is the Right Strategy and How to Measure It
- Digital Manufacturing Platform: What Actually Has to Work
- Digital Shift Log: Structure, MES Integration & Antipatterns
- Digital Work Instructions: Paperless Shopfloor Guide 2026
- Disruption Management in Manufacturing: Guide 2026
- Downtime Monitoring: Detection, Reason Codes & OEE
- Failure Rate in Manufacturing: MTBF, MTTR, OEE and MES Data
- How to measure and improve Production Performance
- Human machine interface in manufacturing
- Industry 1.0 to 5.0: What's Marketing, What's Real
- Inefficiencies in Manufacturing: Hidden Losses
- IoT Integration in Manufacturing: Brownfield Reality
- Machine Condition Data: What to Capture and How to Get It
- Machine Downtime: Categories, MTBF/MTTR & How to Actually Measure It
- Machine Downtime: Causes, Cost & How to Reduce It
- Maintenance Strategies: Reactive vs. Preventive vs. Predictive
- MES Alarm Management: ISA-18.2, Smart Alerting & Escalation
- MES Requirements Specification: Structure & Checklist
- MES Requirements: Specification Structure, RFI/RFP & Pitfalls
- MTBF: Formula, MTTR Comparison & MES-Based Calculation
All terms (50)
- MTBM: Formula, Worked Example and MTBF vs. MTBM
- MTTF: Formula, MTTF vs. MTBF & Spare-Part Strategy
- MTTR: Formula, 5 Repair Phases & MES Time Tracking
- Paperless Manufacturing: From Clipboard to Tablet
- Planned Maintenance Percentage (PMP): Formula & How to Read It
- Planned vs. Reactive Maintenance KPIs
- PLC (Programmable Logic Controller): Definition & Role
- Predictive Maintenance: From P-F Curve to ROI — The Honest 2026 Guide
- Process Automation in Manufacturing: PLC, MES and Workflows
- Process Control System (PCS): Definition, DCS vs. MES
- Process Data: Definition, Capture & MES Role 2026
- Process Monitoring: Real-Time Data Capture in Manufacturing
- Production Data Acquisition: PDA, MDA & Brownfield Reality
- Production Data: Types, Capture & How to Use It
- Production Monitoring & Control: Machine Data, Operating Data & MES
- Production Parameters: Setpoints vs. Actuals
- Production Scheduling: Plan, Reality, and the Gap
- Production Technology: Processes and Selection
- Production Time: Definition, Formula & the OEE Time Cascade
- RCM: The 7 Questions, FMEA Logic & MES Data
- Real-Time Insights in Manufacturing: What It Actually Means
- Schedule Adherence: Formula, OEE Trap & Sequence Rules
- Scrap Costs: True Formula, Benchmarks & How to Reduce Them
- Shitsuke (躾): Why 5S Programs Decay
- Work Order Management in Manufacturing: MES Guide 2026
- Work Plan in Manufacturing: Routing, Recipe & Reality